ACAR Engineering provides residential detention pond design, hydrologic and hydraulic analysis, and PE-sealed engineering reports for residential developments in Houston and surrounding Harris County communities.
Request a Detention Analysis QuoteDetention Pond Analysis & Design
Stormwater detention is often required for residential developments in the Houston area to manage increases in runoff caused by new impervious surfaces. Harris County Flood Control District and the City of Houston have established detention requirements that residential developments must meet before permits are issued.
ACAR Engineering provides comprehensive detention pond design, analysis, and PE-sealed engineering reports for residential projects — from single-lot evaluations to subdivision-scale detention systems.
Harris County Detention Requirements: Harris County Flood Control District requires that new residential development not increase peak stormwater runoff beyond pre-development conditions for the 2-year, 10-year, and 100-year storm events. ACAR Engineering designs detention systems to meet these specific HCFCD criteria.
We respond to all inquiries within one business day.
📞 346-850-5856
Call us to discuss your detention project. We respond within one business day.